Our projects
15.05.2015.Hotel Liburna, Korčula (HR)
Complete reconstruction in 4 months. It is really possible!
more
17.04.2013.Colosseum - Shopping Mall (HR)
Shopping in Slavonski Brod, Colosseum brings new demensions!
more
10.03.2012.HIPERMARKET, Interspar (HR)
Aside shopping centres also hypermarkets belongs to our strenghts.
more
04.04.2008.City Center One, Zagreb-West (HR)
Extension of existing shopping mall City Center One West.
more
PV-PLant Barban (HR)
Development, design and project management
Our services started already with project development which emerged as extremely difficult and lasted over 3 years. The legal basis, connection requirements from the energy provider and approval procedures from the local authorities were changing constantly. Mid-2013 finally our design has been approved, permit issued and the construction could start. The construction took just 3 months, and could only be ensured by a perfect project management.
Key figures
Total Land area: 11,000 m2
Power: 645 kWp
Total area of the panels: 4060 m2
Number of panel: 2688 pcs
Final permanent operation: January, 2014
01.08.2023.
01.05.2023.
20.09.2022.
20.07.2022.
20.03.2022.
01.02.2022.
01.11.2021.
01.11.2021.
01.09.2021.
01.03.2021.
17.04.2020.
19.12.2019.
19.11.2019.
18.11.2019.
12.09.2019.
01.06.2019.
16.05.2019.
15.04.2019.
01.02.2019.
31.12.2018.
18.12.2018.
01.12.2018.
07.06.2018.
01.05.2018.
01.04.2018.
15.03.2018.
20.12.2017.
01.12.2015.
01.11.2015.
01.06.2015.
10.04.2015.
30.03.2015.
10.12.2014.
11.11.2014.
01.08.2014.
12.02.2014.
07.01.2014.
11.12.2013.
01.06.2012.
01.03.2012.
01.11.2010.
05.02.2010.
15.04.2009.
03.09.2008.
01.01.2008.